The steps below are shortened from the Vauxhall TIS pages for the Speedster. The VX220 shares the same engines and most of the car, but check anything unusual against your own car. The TIS pictures and the full wording aren't reproduced, so use the workshop manual if you are doing the job. We haven't seen owners' accounts of this job, so there are no owner tips here.
For dropping the gearbox with the engine in the car see F23 gearbox removal and clutch replacement.
The knock sensor must make full contact with the cylinder block across its entire contact surface – ensure utmost cleanliness. Make sure that the tightening torque is exactly as specified.
Gearbox removal and refitting, engine removed
Turbo (Z20LET)
Remove
- Remove turbocharger heat shield from engine and transmission assembly (Remove 2x bolt)
- Remove transmission from engine assembly (Remove 11x bolt)
Install
- Install transmission to engine assembly (Install 7x bolt 60 Nm; Install 4x bolt 40 Nm)
- Install turbocharger heat shield to engine and transmission assembly (Install 2x bolt)
- Check oil level and top-up if required
NA (Z22SE)
Remove
- Attach the adapter KM-412-27 on the right–hand side.
- Remove the oil dipstick guide tube.
- 1 clip
- Pull the oil dipstick out of the oil dipstick tube.
- 2 clips
- 1 bolt
- Pull the oil dipstick guide tube out of the oil pan.
- Drill out the shear bolt.
- Centre–punch
- Max. depth 10 mm (Use a 3 mm drill.)
- Until the head of the bolt comes free. (Use a 6.5 mm drill.)
- Remove retaining bolt.
- Remove the bridge piece. (Reposition the ground cable to one side.)
- Remove the retaining bolts. (2 bolts)
- Take out the engine control unit.
- Detach the wiring harness bracket. (1 nut)
- Detach the throttle body wiring harness connector. (Release the wiring harness connector(s).)
- Detach the wiring harness connector from the intake manifold pressure sensor.
- Unbolt the exhaust gas recirculation pipe. (2 nuts; 2 bolts)
- Detach the intake manifold. (4 clips; 5 bolts, 2 nuts)
- Remove the knock sensor. (Detach the wiring harness connector.)
- Attach the adapter KM-412-27 on the left–hand side.
- Attach the engine to the assembly stand KM-412. Note: 2 technicians required
- Detach the retaining cables from the engine lifting eyes.
- Detach the lambda probe wiring harness connector. (1 clip)
- Detach the starter motor wiring harness. (1 clip, 1 bolt)
- Unscrew the transmission. (Take out 6 bolts.)
- Detach the transmission.
- Attach the securing cables.
- Hook the transmission into the workshop crane.
- Remove 1 bolt.
- Detach the engine/transmission flanges.
Install
- Attach the transmission.
- Hook the transmission into the workshop crane.
- Attach the gearbox/engine flanges.
- Install 1 bolt.
- Unhook from the workshop crane.
- Detach the securing cables.
- Tighten the bolts on the transmission. (Tightening torque 60 Nm; Tightening torque 22 Nm)
- Attach the starter motor wiring harness. (1 bolt, 1 clip)
- Attach the lambda probe wiring harness connector. (1 clip)
- Hook the engine into the workshop crane.
- Attach the securing straps to the engine lifting eyes.
- Detach the engine from the assembly stand KM-412. Note: 2 technicians required (Carefully set down the engine.)
- Detach the adapter KM-412-27 on the left–hand side.
- Install the knock sensor. (Attach the wiring harness connector.)
- Attach the intake manifold. (Use new gaskets.; Tightening torque 9 Nm; Attach the 4 clips.)
- Attach the exhaust gas recirculation pipe. (Clean the sealing surfaces.; Use a new gasket.; Tightening torque 9 Nm; Tightening torque 8 Nm)
- Attach the wiring harness connector for the intake manifold pressure sensor.
- Attach the wiring harness connector for the throttle body. (Secure the wiring harness connector(s).)
- Attach the wiring harness bracket (Tightening torque 8 Nm)
- Clean the engine control unit.
- Clean the engine control unit and the plug contacts with
- Install the engine control unit.
- Tightening torque 9 Nm
- Attach and secure the wiring harness connector.
- Route the ground cable.
- Tightening torque 10 Nm
- Install the oil dipstick guide tube.
- Coat the oil seals with silicone grease (white).
- Insert the oil dipstick guide tube as far as the stop into the
- Tightening torque 9 Nm
- Insert the oil dipstick.
- Attach the knock sensor wiring harness to the oil dipstick
- 2 clips
- Detach the adapter KM-412-27 on the right–hand side.
- Attach the engine to the workshop crane. Note: 2 technicians required
- Raise the engine.
Gearbox and engine: separate and reattach (NA)
NA (Z22SE) only.
Procedure
- Attach the adapter KM-412-27 on the right–hand side.
- Remove the oil dipstick guide tube.
- 1 clip
- Pull the oil dipstick out of the oil dipstick tube.
- 2 clips
- 1 bolt
- Pull the oil dipstick guide tube out of the oil pan.
- Drill out the shear bolt.
- Centre–punch
- Max. depth 10 mm (Use a 3 mm drill.)
- Until the head of the bolt comes free. (Use a 6.5 mm drill.)
- Remove retaining bolt.
- Remove the bridge piece. (Reposition the ground cable to one side.)
- Remove the retaining bolts. (2 bolts)
- Take out the engine control unit.
- Detach the wiring harness bracket. (1 nut)
- Detach the throttle body wiring harness connector. (Release the wiring harness connector(s).)
- Detach the wiring harness connector from the intake manifold pressure sensor.
- Unbolt the exhaust gas recirculation pipe. (2 nuts; 2 bolts)
- Detach the intake manifold. (4 clips; 5 bolts, 2 nuts)
- Remove the knock sensor. (Detach the wiring harness connector.)
- Attach the adapter KM-412-27 on the left–hand side.
- Attach the engine to the assembly stand KM-412. Note: 2 technicians required
- Detach the retaining cables from the engine lifting eyes.
- Detach the lambda probe wiring harness connector. (1 clip)
- Detach the starter motor wiring harness. (1 clip, 1 bolt)
- Unscrew the transmission. (Take out 6 bolts.)
- Detach the transmission.
- Attach the securing cables.
- Hook the transmission into the workshop crane.
- Remove 1 bolt.
- Detach the engine/transmission flanges.
- Attach the transmission.
- Hook the transmission into the workshop crane.
- Attach the gearbox/engine flanges.
- Install 1 bolt.
- Unhook from the workshop crane.
- Detach the securing cables.
- Tighten the bolts on the transmission. (Tightening torque 60 Nm; Tightening torque 22 Nm)
- Attach the starter motor wiring harness. (1 bolt, 1 clip)
- Attach the lambda probe wiring harness connector. (1 clip)
- Hook the engine into the workshop crane.
- Attach the securing straps to the engine lifting eyes.
- Detach the engine from the assembly stand KM-412. Note: 2 technicians required (Carefully set down the engine.)
- Detach the adapter KM-412-27 on the left–hand side.
- Install the knock sensor. (Attach the wiring harness connector.)
- Attach the intake manifold. (Use new gaskets.; Tightening torque 9 Nm; Attach the 4 clips.)
- Attach the exhaust gas recirculation pipe. (Clean the sealing surfaces.; Use a new gasket.; Tightening torque 9 Nm; Tightening torque 8 Nm)
- Attach the wiring harness connector for the intake manifold pressure sensor.
- Attach the wiring harness connector for the throttle body. (Secure the wiring harness connector(s).)
- Attach the wiring harness bracket (Tightening torque 8 Nm)
- Clean the engine control unit.
- Clean the engine control unit and the plug contacts with
- Install the engine control unit.
- Tightening torque 9 Nm
- Attach and secure the wiring harness connector.
- Route the ground cable.
- Tightening torque 10 Nm
- Install the oil dipstick guide tube.
- Coat the oil seals with silicone grease (white).
- Insert the oil dipstick guide tube as far as the stop into the
- Tightening torque 9 Nm
- Insert the oil dipstick.
- Attach the knock sensor wiring harness to the oil dipstick
- 2 clips
- Detach the adapter KM-412-27 on the right–hand side.
- Attach the engine to the workshop crane. Note: 2 technicians required
- Raise the engine.
